DAFTAR HARGA TAHAP VI
(CLUSTER TULIP)
Asumsi Bunga KPR: 9.50% (fixed/tetap 1 tahun Pertama)
|
Type |
Harga Jual |
Uang Muka |
KPR |
Angsuran/Bulan |
|
||||||||||
|
PAKET |
10% |
5 Tahun |
10 Tahun |
15 Tahun |
|
||||||||||
|
21/60 |
140,500,000 |
14,000,000 |
126,500,000 |
2,657,000 |
1,637,000 |
1,321,000 |
|
||||||||
|
|||||||||||||||
|
Type |
Harga Jual |
Uang Muka |
KPR |
Angsuran/Bulan |
|
||||||||||
|
PAKET |
20% |
5 Tahun |
10 Tahun |
15 Tahun |
|
||||||||||
|
21/60 |
140,500,000 |
28,500,000 |
112,000,000 |
2,352,000 |
1,449,000 |
1,170,000 |
|
||||||||
|
|||||||||||||||
|
Type |
Harga Jual |
UangMuka |
KPR |
Angsuran/Bulan |
|
||||||||||
|
PAKET |
30% |
5 Tahun |
10 Tahun |
15 Tahun |
|
||||||||||
|
21/60 |
140,500,000 |
42,500,000 |
98,000,000 |
2,058,000 |
1,268,000 |
1,023,000 |
|
||||||||
|
Harga tersebut diatas sudah termasuk
IMB, Air, Listrik,PPN (BPHTB,AJB dan Biaya Proses
Bank di discount dari UM) |
|
||||||||||||||
|
|||||||||||||||
|
Type |
Harga Jual |
Harga Jual |
Harga |
Uang Muka |
KPR |
Angsuran/ Bulan |
|
||||||||
|
NON PAKET |
Disc.10% |
Cash Keras |
Cash 4 X |
Cash 6 X |
Cash 10 X |
10% |
5 Tahun |
10 Tahun |
15 Tahun |
|
|||||
|
21/60 |
137,600,000 |
123,800,000 |
120,100,000 |
123,800,000 |
125,200,000 |
128,000,000 |
12,300,000 |
111,500,000 |
2,342,000 |
1,443,000 |
1,164,000 |
|
|||
|
|||||||||||||||
|
Type |
Harga Jual |
UangMuka |
KPR |
Angsuran/Bulan |
Uang Muka |
KPR |
Angsuran/ Bulan |
|
|||||||
|
NON PAKET |
20% |
5 Tahun |
10 Tahun |
15 Tahun |
30% |
5 Tahun |
10 Tahun |
15 Tahun |
|
||||||
|
21/60 |
123,800,000 |
24,800,000 |
99,000,000 |
2,079,000 |
1,281,000 |
1,034,000 |
38,800,000 |
87,000,000 |
1,827,000 |
1,126,000 |
908,000 |
|
|||
|
Harga tersebut diatas sudah termasuk
IMB, Air, Listrik, PPN kecuali
BPHTB, AJB dan Biaya Proses Bank (untuk yang KPR) |
|
||||||||||||||
Asumsi Bunga KPR: 6.80% (fixed/tetap 1 tahun Pertama), khusus Bank Mandiri, berlaku periode Mei – Juni 2010
|
Type |
Harga Jual |
Uang Muka |
KPR |
Angsuran/Bulan |
|||||||
|
PAKET |
10% |
5 Tahun |
10 Tahun |
15 Tahun |
|||||||
|
21/60 |
135,000,000 |
13,500,000 |
121,500,000 |
2,394,000 |
1,398,000 |
1,079,000 |
|||||
|
Type |
Harga Jual |
Uang Muka |
KPR |
Angsuran/Bulan |
|||||||
|
PAKET |
20% |
5 Tahun |
10 Tahun |
15 Tahun |
|||||||
|
21/60 |
135,000,000 |
27,000,000 |
108,000,000 |
2,128,000 |
1,243,000 |
959,000 |
|||||
|
Type |
Harga Jual |
UangMuka |
KPR |
Angsuran/Bulan |
|||||||
|
PAKET |
30% |
5 Tahun |
10 Tahun |
15 Tahun |
|||||||
|
21/60 |
135,000,000 |
40,000,000 |
95,000,000 |
1,872,000 |
1,093,000 |
843,000 |
|||||
|
Harga tersebut diatas sudah termasuk
IMB, Air, Listrik,PPN (BPHTB,AJB dan Biaya Proses
Bank di discount dari UM) |
|||||||||||
|
Type |
Harga Jual |
Harga Jual |
Harga |
Uang Muka |
KPR |
Angsuran/ Bulan |
|||||
|
NON PAKET |
Disc.10% |
Cash Keras |
Cash 4 X |
Cash 6 X |
Cash 10 X |
10% |
5 Tahun |
10 Tahun |
15 Tahun |
||
|
21/60 |
132,000,000 |
118,800,000 |
115,200,000 |
118,800,000 |
120,100,000 |
122,800,000 |
11,800,000 |
107,000,000 |
2,109,000 |
1,231,000 |
950,000 |
|
Type |
Harga Jual |
UangMuka |
KPR |
Angsuran/Bulan |
Uang Muka |
KPR |
Angsuran/ Bulan |
||||
|
NON PAKET |
20% |
5 Tahun |
10 Tahun |
15 Tahun |
30% |
5 Tahun |
10 Tahun |
15 Tahun |
|||
|
21/60 |
118,800,000 |
23,800,000 |
95,000,000 |
1,995,000 |
1,229,000 |
992,000 |
35,800,000 |
83,000,000 |
1,636,000 |
955,000 |
737,000 |
|
Harga tersebut diatas sudah termasuk
IMB, Air, Listrik, PPN kecuali
BPHTB, AJB dan Biaya Proses Bank (untuk yang KPR) |
|||||||||||
Harga tersebut diatas sewaktu-waktu
dapat berubah.
Keterangan
:
·
Booking Fee/Tanda
Jadi Rp.1.000.000,- (sudah termasuk dalam Harga Jual/Uang Muka) dan bila mengundurkan
diri/batal Booking Fee hangus
·
Pembelian
dapat dilakukan dengan cara
Cash Keras, Cash Bertahap
dan KPR
·
Ketentuan
Pembelian secara Cash Keras dan Cash Bertahap :
o Cash Keras harus dilunasi paling lama 1 bulan setelah tanggal
Booking Fee
o Cash bertahap
dapat diangsur selama 4 X (4 bln), 6 X (6 bln) dan 10 X (10 bln)
o Keterlambatan
pembayaran akan dikenakan denda per hari 0,3 per mil dari ½ harga jual rumah
setelah dipotong uang yang sudah masuk ke Developer, terhitung dari tgl jatuh tempo
o Developer berhak
membatalkan sepihak apabila tidak ada
kelanjutan pembayaran paling
lama 1 bulan terhitung dari jatuh tempo
o Perubahan
dan penambahan bangunan diizinkan setelah pembayaran lunas
·
Ketemtuan
Pembelian secara KPR :
o Uang
muka dapat diangsur 3 X (3 bln)
o Persyaratan
KPR harus dilengkapi dan diajukan ke
Bank paling lama 1 bln setelah
Booking Fee
o Apabila
permohonan Kredit sudah disetujui oleh pihak Bank sebelum UM lunas maka yang bersangkutan harus melunasi UM, AJB, BPHTB dan biaya proses
bank sebelum Akad Kredit
o Keterlambatan
pembayaran UM akan dikenakan denda per hari 0,3 per mil dari ½ harga jual rumah
setelah dipotong uang yang sudah masuk ke Developer, terhitung dari tgl jatuh tempo
o
Batal
karena permohonan KPR ditolak Bank, uang yang telah disetor dikembalikan
30 s/d 45 hari dari tgl pengajuan pengunduran
diri dan dipotong biaya administrasi Rp. 1.000.000,-
o Perubahan
dan penambahan bangunan diizinkan setelah Akad Kredit
·
KPR melalui
Bank Mandiri, NISP, NIAGA, BNI, MEGA, BUKOPIN, BTN,
BRI.
·
Pindah
Kavling hanya diizinkan sebelum aplikasi KPR masuk pada pihak Bank dan dikenakan denda
sebesar 1 % X Harga Jual
Denda
Pengunduran Diri :
Untuk
Pembelian dengan cara KPR
·
Sebelum
Persetujuan Kredit
Denda
Rp.
3.000.000
·
Sesudah
turun Persetujuan Kredit
Denda
Rp.
7.500.000
Untuk
Pembelian Tunai
Denda
Rp.
10.000.000